PT Bangun Nagamas Kontraktor





See Map
JL. Imam Bonjol, No. 89 B Panunggangan Barat Karawaci, Tangerang, 15115, Indonesia Kota Tangerang
Banten , Indonesia



We Are A Company Which Is Engaged In Building Construction, Which Focuses On The Provision Of Precast Concrete And Pile Foundation (Mini Pile).

Precast Concrete :
Panel Specifications:
- Length = 2400Mm
- Width = 50Mm
- Height = 400Mm And 500Mm
- Quality Concrete = K175-225

Column Specifications:
- Length = 2000Mm - 6000Mm
- Dimensions = 17X17cm
- Quality Concrete = K175-225

* Max 4M High Fence
* Work Only Covers The Greater Jakarta Area (Jabodetabek).

---------------------------------------------------------------------------------------------------

Pile Foundation (Mini Pile):
Pile Specifications:
- Dimensions = 28X28x28 Cm
  Reinforcement Iron Screw = (10/13/16) Mm
  Length = 3000 Mm And 6000 Mm
  Quality Concrete = K-450

- Dimensions = 32X32x32 Cm
  Reinforcement Iron Screw = (13/16) Mm
  Length = 3000 Mm And 6000 Mm
  Quality Concrete = K-450

- Dimensions = 20X20 Cm
  Reinforcement Iron Screw = (10/13) Mm
  Length = 3000 Mm And 6000 Mm
  Quality Concrete = K-450

- Dimensions = 25X25 Cm
  Reinforcement Iron Screw = (13/16) Mm
  Length = 3000 Mm And 6000 Mm
  Quality Concrete = K-450

Pile Foundation (Maxi Pile) :
Pile Specifications :
- Dimension = Square Pile 30x30 cm (Prestressed Concrete)
- Dimension = Square Pile 35x35 cm (Prestressed Concrete)
- Dimension = Square Pile 40x40 cm (Prestressed Concrete)
- Dimension = Square Pile 45x45 cm (Prestressed Concrete)

Specifications Pile Engine:
- Drop Hammer
- Hydraulic Jacking
- Diesel Hammer + Crane

CP : Andreas Halim
HP : 085212515192

PT. BANGUN NAGAMAS KONTRAKTOR



JL. Imam Bonjol, No. 89 B Panunggangan Barat Karawaci, Tangerang, 15115, Indonesia Kota Tangerang
Banten , Indonesia